dresden elektronik Logo

Bremen Hans-Bredow-Strasse / Julius-Faucher-Strasse

Installed by:

Ralf Mahn elektrotechnik

Location:

Bremen - Hans-Bredow-Strasse / Julius-Faucher-Strasse

Situation:

Upgrading of a tram line

Task:

Installation of a portable traffic light system with 230 VAC technology for controlling the intersection during construction until the installation of a new stationary traffic light system.

Solution:

Solution

Equipment:

1 control cabinet consisting of
  • deTRAst control unit
  • deTRAst switch card case
  • 10 centralized switch cards, 230 VAC
  • deTRAplex control computer
2 traffic detectors
12 vehicle signal heads
14 pedestrian / cyclist signal heads
Total of 26 signal heads in 14 signal groups
9 infrared detectors
4 fixed time programs, 5 partial traffic dependent programs, 1 complete traffic dependent program

Photos:

Photo
Photo

In service:

June 11, 2007

Contact:

dresden elektronik ingenieurtechnik gmbh  |  Disclaimer  |  Contact  |  Sitemap  |  Drucker-SymbolPrintable version